Maple Shade Water Department is two weeks into the Fall Hydrant Flushing. We are 74% complete. The picture below shows the progress of the flushing. The blue hydrants are ones that have been flushed and the red hydrants still need to be flushed. There is one more week of flushing. We will send out an update when we are done.