2020 Fall Hydrant Flushing Update 10/16/2020

Maple Shade Water Department is one week into the Fall Hydrant Flushing. We are 36% complete. The picture below shows the progress of the flushing. The blue hydrants are ones that have been flushed and the red hydrants still need to be flushed. We will send out updates as we progress.

Hydrant Flushing Post 10.16.20.JPG